TABELLA DI RILEVAMENTO DEI COSTI DEI MATERIALI, TRASPORTI E NOLI

Rilevamento Bimestrale – Anno 2003

ELEMENTI DI COSTO

U.M.

RIFERIMENTO TABELLE

PROV.

GEN

FEB

MAR

APR

MAG

GIU

LUG

AGO

SET

OTT

NOV

DIC

 

 

 

DM 11/12/1978

DM 22/6/1968

 

2003

2003

2003

2003

2003

2003

 

MATERIALI

 

 

 

 

 

 

 

 

 

 

1

MISTO DI FIUME O DI CAVA (TOUT-VENANT) OPPURE MISTO

MC

1-4

-

TUTTE

6,30

6,30

6,30

6,30

6,30

6,30

2

ESPLOSIVO

KG

1-3

-

TUTTE

2,99

2,99

2,99

2,99

2,99

2,99

3

LEGNAME ABETE SOTTOMISURA

OPPURE LEGNAME ABETE

MC

 

2-3-9-10-12-13-14-17-11

 

3-4-5-6-7-10

 

TUTTE

261,84

261,84

261,84

261,84

261,84

261,84

 

4

PIETRISCO PER CALCESTRUZZO

OPPURE PIETRISCO

MC

2-3-6-7-9-10-12-13-14-17

1-2-3-4-5-6-7-8

AN

11,62

11,62

11,62

11,62

11,62

11,62

 

MC

4-5-11-17

-

AP

12,34

12,34

12,34

12,34

12,34

12,34

 

 

-

-

MC

14,62

14,62

14,62

14,62

14,62

14,62

 

 

-

-

PS

14,46

14,46

14,46

14,46

14,46

14,46

5

SABBIA

MC

2-3-4-5-7-8-9-11-12-13-14-15-17

1-2-3-4-5-6-7-8-9-10

AN

17,30

17,30

17,30

17,30

17,30

17,30

 

 

-

-

AP

17,30

17,30

17,30

17,30

17,30

17,30

 

 

-

-

MC

17,30

17,30

17,30

17,30

17,30

17,30

 

 

-

-

PS

20,92

20,92

20,92

20,92

20,92

20,92

6

CEMENTO TIPO 425

QL

2-3-4-6-7-8-9-10-11-12-13-14-17

10

TUTTE

8,55

8,55

8,55

8,55

8,55

8,55

7

FERRO FeB 38K

KG

2-3-4-6-7-8-9-10-11-12-15-17

-

TUTTE

0,199

0,203

0,203

0,203

0,203

0,203

8

BITUME

KG

4-5-6-7

1

TUTTE

0,380

0,380

0,400

0,400

0,400

0,400

9

GRANIGLIA

MC

5

-

TUTTE

10,33

10,33

10,33

10,33

10,33

10,33

10

MISTO GRANULOMETRICO

MC

5-6

-

TUTTE

12,14

12,14

12,14

12,14

12,14

12,14

11

LAVABO

CAD

8

-

TUTTE

37,70

37,70

37,70

37,70

37,70

37,70

12

MATTONI FORATI 4 FORI

N

8

-

TUTTE

95,61

95,61

95,61

95,61

95,61

95,61

13

LEGNAME ABETE PER INFISSI

MC

8

2

TUTTE

384,76

384,76

384,76

384,76

384,76

384,76

14

MARMITTONI

MQ

8

-

TUTTE

11,04

11,56

11,56

11,56

11,56

11,56

15

PIETRAME

MC

9-10

3-4

TUTTE

6,66

6,66

6,66

6,66

6,66

6,66

16

GABBIONI

KG

10

4

TUTTE

1,91

1,91

1,91

1,91

1,91

1,91

17

TUBAZIONI

ML

11

5

TUTTE

41,21

41,21

41,21

41,21

41,21

41,21

18

TUBAZIONE (PVC)

ML

13

7

TUTTE

5,95

5,95

5,95

6,78

6,78

6,78

19

SCOGLI

TON

15

-

TUTTE

8,11

8,11

8,11

8,11

8,11

8,11

20

CEMENTO

QL

15

-

TUTTE

7,04

7,04

7,04

7,04

7,04

7,04

21

PALO CENTRIFUGATO 6-8 ML

CAD

18

-

TUTTE

196,25

196,25

196,25

196,25

196,25

196,25

22

FILI DI RAME CONDUTTORI

KG

18

-

TUTTE

4,34

4,34

4,34

4,34

4,34

4,34

23

FERRO LAVORATO

OPPURE FERRO PROFILATO

KG

18-23

11

TUTTE

0,607

0,631

0,631

0,631

0,631

0.656

24

TUBAZIONE ZINCATA S.S. D=1

KG

19

-

TUTTE

1,08

1,08

1,08

1,08

1,08

1,08

25

TUBAZIONE PIOMBO

KG

19

-

TUTTE

0,57

0,57

0,57

0,57

0,57

0,57

26

TUBAZIONE PLASTICA PESANTE D=100

ML

19

-

TUTTE

6,66

6,66

6,66

6,66

6,66

6,66

27

RUBINETTERIA GRUPPO MISCELATORE LAVABO

N.1

19

-

TUTTE

45,40

45,40

45,40

45,40

45,40

45,40

28

LAVABO PORCELLANA 60X40

N.1

19

-

TUTTE

42,25

42,25

42,25

42,25

42,25

42,25

29

TUBO IN MATERIALE PLASTICO

ML

20

-

TUTTE

0,19

0,19

0,19

0,197

0,197

0,197

30

CONDUTTURA IN RAME

ML

20

--

TUTTE

0,33

0,33

0,33

0,341

0,341

0,341

31

INTERRUTTORE BIPOLARE MAGNETOTERMICO

N.1

20

-

TUTTE

39,40

39,40

39,40

40,99

40,99

40,99

32

INTERRUTTORE DIFFERENZIALE

N

20

-

TUTTE

61,82

61,82

61,82

64,29

64,29

64,29

33

PRESA DA INCASSO 10 A+T

N

20

-

TUTTE

4,91

4,91

4,91

5,11

5,11

5,11

34

LAMIERA DA ACCIAIO 20/10

KG

20

-

TUTTE

0,46

0,46

0,46

0,46

0,46

0,46

35

TUBAZIONI ACCIAIO NERO

KG

21-22

-

TUTTE

0,70

0,70

0,70

0,70

0,70

0,70

ELEMENTI DI COSTO

U.M.

RIFERIMENTO TABELLE

PROV.

GEN

FEB

MAR

APR

MAG

GIU

LUG

AGO

SET

OTT

NOV

DIC

 

 

 

DM 11/12/1978

DM 22/6/1968

 

2003

2003

2003

2003

2003

2003

36

CALDAIA IN ACCIAIO

N

21

-

TUTTE

578,43

578,43

578,43

578,43

578,43

578,43

37

RADIATORI IN GHISA

MQ

21

11

TUTTE

18,70

18,70

18,70

18,70

18,70

18,70

38

LAMIERA ZINCATA LAVORATA PER CANALIZZAZIONI

KG

22

-

TUTTE

1,63

1,63

1,63

1,63

1,63

1,63

39

VENTILCONVETTORI VERTICALI 1000 F/H

CAD

22

-

TUTTE

146,16

146,16

146,16

146,16

146,16

146,16

40

CALDAIA PRESSURIZZATA 300.000 KAL/H

CAD

22

-

TUTTE

3.356,97

3.356,97

3.356,97

3.356,97

3.356,97

3.356,97

41

GRUPPO REFRIGERATORE ACQUA 100 HP

CAD

22

-

TUTTE

13.944,34

13.944,34

13.944,34

13.944,34

13.944,34

13.944,34

42

LAMINATI A CALDO

KG

23

-

TUTTE

0,607

0,631

0,631

0,631

0,631

0.656

43

GHISA FUSA IN PANI KG 21-100

KG

23

-

TUTTE

0,24

0,24

0,24

0,24

0,24

0,24

44

CAVO RIGIDO UNIPOL. SEZ 1MMQ ISOLATO P.V.C

ML

23

-

TUTTE

0,09

0,09

0,09

0,089

0,089

0,089

45

MATTONI PIENI COMUNI

CAD

-

2

TUTTE

100,19

100,19

100,19

100,19

100,19

100,19

46

MARMETTE

MQ

-

2

TUTTE

10,74

11,25

11,25

11,25

11,25

11,25

47

PIETRAME

MC

-

8

TUTTE

19,06

19,06

19,06

19,06

19,06

19,06

48

CEMENTO TIPO 600

QL

-

1-2-3-4-5-6-7-8

TUTTE

7,22

7,22

7,22

7,22

7,22

7,22

49

PALO IN C.A. CENTRIFUGATO

ML

-

12

TUTTE

21,43

21,43

21,43

21,43

21,43

21,43

50

TUBO FERRO NERO

KG

-

11

TUTTE

0,68

0,68

0,68

0,68

0,68

0,68

51

FILI DI RAME CONDUTTORI

ML

-

12

TUTTE

0,20

0,20

0,20

0,20

0,20

0,20

52

FERRO AQ 42

KG

-

1-2-4-5-6-7-8-10

TUTTE

0,198

0,202

0,202

0,202

0,202

0.210

 

TRASPORTI

 

 

 

 

 

 

 

 

 

 

53

AUTOCARRO

QL/KM

TUTTE

TUTTE

TUTTE

0,0177

0,0177

0,0177

0,0184

0,0184

0,0184

 

NOLI

 

 

 

 

 

 

 

 

 

 

54

BULDOZER

H

1-4-6-7-9-11-12

1-3-5-6

TUTTE

39,72

39,72

39,72

41,29

41,29

41,29

55

ESCAVATORE

H

1-2-6-9-10-11-12-13-15-17

1-3-4-5-6-7-8-10

TUTTE

28,48

28,48

28,48

29,65

29,65

29,65

56

WAGON DRILL

H

1

-

TUTTE

44,83

44,83

44,83

47,09

47,09

47,09

57

RULLO VIBRANTE

H

1-5-9

3

TUTTE

21,33

21,33

21,33

22,30

22,30

22,30

58

MOTOLIVELLATORE

H

1-5

-

TUTTE

29,39

29,39

29,39

30,66

30,66

30,66

59

GRU

H

2-6-7-8-17-18

-

TUTTE

16,58

16,58

16,58

17,41

17,41

17,41

60

IMPIANTO BETONAGGIO

H

2-3-4

-

TUTTE

45,29

45,29

45,29

47,83

47,83

47,83

61

ATTREZZATURA PERFORAZIONE PALI

H

2

-

TUTTE

85,78

85,78

85,78

88,74

88,74

88,74

62

PALA MECCANICA

H

3-7

-

TUTTE

35,38

35,38

35,38

36,78

36,78

36,78

63

MARTELLO PERFORATORE

H

3-4-7

-

TUTTE

16,17

16,17

16,17

16,93

16,93

16,93

64

VIBROFINITRICE

H

5

-

TUTTE

39,25

39,25

39,25

41,00

41,00

41,00

65

IMPIANTO PRODUZIONE COMPONENTI BITUMINOSI

H

5

-

TUTTE

240,57

240,57

240,57

247,49

247,49

247,49

66

MARTELLO PERFORATORE E DEMOLITORE

H

6

-

TUTTE

16,17

16,17

16,17

16,93

16,93

16,93

67

BETONIERA

H

8-9-10-11-12-13-14-15-17

1-2-3-4-5-6-7-10

TUTTE

7,39

7,39

7,39

7,71

7,71

7,71

68

RIMORCHIATORE

H

14-15-16

8-9

TUTTE

70,13

70,13

70,13

73,16

73,16

73,16

69

PONTONE

H

14-15-16

8-9

TUTTE

65,95

65,95

65,95

68,80

68,80

68,80

70

DRAGA

H

16

8-9

TUTTE

230,18

230,18

230,18

240,11

240,11

240,11

71

MOTOSALDATRICE

H

19-21-22

-

TUTTE

9,97

9,97

9,97

10,49

10,49

10,49

72

RULLO COMPRESSORE PESANTE

H

-

1

TUTTE

24,02

24,02

24,02

25,11

25,11

25,11

73

SALDATRICE ELETTRICA

H

-

11

TUTTE

9,97

9,97

9,97

10,49

10,49

10,49

74

AUTOBOTTE

H

-

-

TUTTE

52,99

52,99

52,99

55,01

55,01

55,01

75

ELEVATORE

H

-

-

TUTTE

15,08

15,08

15,08

15,84

15,84

15,84

76

FILLER DI ROCCIA ASFALTICA

QL

-

-

TUTTE

2,53

2,53

2,53

2,53

2,53

2,53

77

EMULSIONE BITUMINOSA

QL

-

2-10-12

TUTTE

31,16

31,16

31,16

31,16

31,16

31,16

78

VERNICE SPARTITRAFFICO RIFRANGENTE

KG

-

-

TUTTE

1,00

1,00

1,00

1,00

1,00

1,00